Rak Gudang Logistik Pelabuhan Tianjin untuk BohaiLink Logistics
Projek Pilihan

Rak Gudang Logistik Pelabuhan Tianjin untuk BohaiLink Logistics

Pelanggan BohaiLink Logistics
Siap April 2026
Rak Gudang Logistik Pelabuhan Tianjin untuk BohaiLink Logistics

Gambaran Projek

Projek ini di Tianjin untuk BohaiLink Logistics memberi tumpuan kepada a port-side logistics warehouse receiving containerized imports, export consolidation cargo, and short-stay pallet inventory. Matlamatnya bukan sekadar menambah rak, tetapi membina sistem yang menyokong kapasiti, keselamatan dan kelajuan operasi harian.

Runda Rack reviewed the movement of goods, staff routines, available space, load requirements, and the points where time was being lost. The final design focused on high-bay pallet racking, container unloading buffers, wide forklift circulation, corrosion-resistant finishes, and clear dispatch staging.

Konteks Pelanggan & Pasaran

In China’s dense commercial and industrial environment, every square metre must work harder. BohaiLink Logistics needed a rack system that could support change, reduce daily friction, and remain clear for staff, shoppers, inspectors, or forklift operators.

The project therefore required more than standard shelving. It needed a layout logic that could support seasonal changes, campaign peaks, replenishment, cleaning, audit control, and future expansion.

Cabaran

Cabaran utama ialah container arrivals created sudden pallet surges, salty coastal air accelerated surface wear, and mixed import/export staging caused forklift cross-traffic. This issue affected productivity, safety, inventory control, and the quality of presentation or storage.

The site also had to keep operating. Existing stock, deliveries, customers, forklifts, production shifts, or sanitation windows had to be respected during installation.

Penyelesaian Kejuruteraan

Penyelesaiannya ialah high-bay selective racking with reinforced frames, anti-corrosion coating, dock-facing buffer lanes, one-way forklift loops, and staging labels tied to vessel schedules. Heights, depths, finishes, protection accessories, and label positions were selected according to the real flow of products and materials.

The layout separated high-frequency and low-frequency areas, clarified display, reserve, inspection, and dispatch positions, and reinforced zones exposed to impact, humidity, or heavy handling.

Pemasangan & Penyerahan

The project was staged between vessel peaks, with rack rows commissioned progressively so operations could keep receiving and dispatching containers. Components were sorted by zone and numbered so installation crews could move quickly from unloading to assembly.

Critical areas were completed first. After each phase, the team checked replenishment, picking, cleaning, customer circulation, or forklift routes before migrating the next zone.

Impak Perniagaan

BohaiLink can absorb arrival peaks, separate import and export flows more clearly, and move pallets from dock to rack to dispatch with fewer conflict points. The result was not only more capacity, but better control of the whole operating environment.

Metrik utama projek ini ialah Pallet Positions +48%, Container Turnaround +27%, Cross-traffic Conflicts -34%. These figures show that storage capacity becomes valuable only when teams can use it quickly, safely, and consistently.

Nilai Jangka Panjang

The warehouse now has a durable logistics backbone suited to Tianjin’s port environment and future growth in bonded and cross-border distribution. The client now has a clearer standard for future upgrades and site planning.

Bagi Runda Rack, kes ini membuktikan bahawa setiap tapak memerlukan reka bentuk khusus, bukan spesifikasi umum.

Perlukan Penyelesaian Serupa?

Pakar kami sedia mereka bentuk sistem paparan atau rak tersuai mengikut matlamat spesifik anda.