Rayonnage d’Entrepôt Portuaire à Tianjin pour BohaiLink Logistics
Projet Vedette

Rayonnage d’Entrepôt Portuaire à Tianjin pour BohaiLink Logistics

Client BohaiLink Logistics
Réalisation April 2026
Rayonnage d’Entrepôt Portuaire à Tianjin pour BohaiLink Logistics

Présentation du Projet

Ce projet à Tianjin pour BohaiLink Logistics portait sur a port-side logistics warehouse receiving containerized imports, export consolidation cargo, and short-stay pallet inventory. L’objectif n’était pas seulement d’ajouter des rayonnages, mais de créer un système améliorant capacité, sécurité et vitesse d’exploitation.

Runda Rack reviewed the movement of goods, staff routines, available space, load requirements, and the points where time was being lost. The final design focused on high-bay pallet racking, container unloading buffers, wide forklift circulation, corrosion-resistant finishes, and clear dispatch staging.

Client et Contexte du Marché

In China’s dense commercial and industrial environment, every square metre must work harder. BohaiLink Logistics needed a rack system that could support change, reduce daily friction, and remain clear for staff, shoppers, inspectors, or forklift operators.

The project therefore required more than standard shelving. It needed a layout logic that could support seasonal changes, campaign peaks, replenishment, cleaning, audit control, and future expansion.

Le Défi

Le principal défi était que container arrivals created sudden pallet surges, salty coastal air accelerated surface wear, and mixed import/export staging caused forklift cross-traffic. This issue affected productivity, safety, inventory control, and the quality of presentation or storage.

The site also had to keep operating. Existing stock, deliveries, customers, forklifts, production shifts, or sanitation windows had to be respected during installation.

Solution d’Ingénierie

La solution retenue fut high-bay selective racking with reinforced frames, anti-corrosion coating, dock-facing buffer lanes, one-way forklift loops, and staging labels tied to vessel schedules. Heights, depths, finishes, protection accessories, and label positions were selected according to the real flow of products and materials.

The layout separated high-frequency and low-frequency areas, clarified display, reserve, inspection, and dispatch positions, and reinforced zones exposed to impact, humidity, or heavy handling.

Installation et Livraison

The project was staged between vessel peaks, with rack rows commissioned progressively so operations could keep receiving and dispatching containers. Components were sorted by zone and numbered so installation crews could move quickly from unloading to assembly.

Critical areas were completed first. After each phase, the team checked replenishment, picking, cleaning, customer circulation, or forklift routes before migrating the next zone.

Impact Commercial

BohaiLink can absorb arrival peaks, separate import and export flows more clearly, and move pallets from dock to rack to dispatch with fewer conflict points. The result was not only more capacity, but better control of the whole operating environment.

Les indicateurs clés sont Pallet Positions +48%, Container Turnaround +27%, Cross-traffic Conflicts -34%. These figures show that storage capacity becomes valuable only when teams can use it quickly, safely, and consistently.

Valeur à Long Terme

The warehouse now has a durable logistics backbone suited to Tianjin’s port environment and future growth in bonded and cross-border distribution. The client now has a clearer standard for future upgrades and site planning.