Resumen del Proyecto
Este proyecto en Tianjin para BohaiLink Logistics se centró en a port-side logistics warehouse receiving containerized imports, export consolidation cargo, and short-stay pallet inventory. El objetivo no era solo instalar más estanterías, sino crear un sistema que mejorara capacidad, seguridad y velocidad operativa.
Runda Rack reviewed the movement of goods, staff routines, available space, load requirements, and the points where time was being lost. The final design focused on high-bay pallet racking, container unloading buffers, wide forklift circulation, corrosion-resistant finishes, and clear dispatch staging.
Cliente y Contexto del Mercado
In China’s dense commercial and industrial environment, every square metre must work harder. BohaiLink Logistics needed a rack system that could support change, reduce daily friction, and remain clear for staff, shoppers, inspectors, or forklift operators.
The project therefore required more than standard shelving. It needed a layout logic that could support seasonal changes, campaign peaks, replenishment, cleaning, audit control, and future expansion.
El Reto
El reto principal fue que container arrivals created sudden pallet surges, salty coastal air accelerated surface wear, and mixed import/export staging caused forklift cross-traffic. This issue affected productivity, safety, inventory control, and the quality of presentation or storage.
The site also had to keep operating. Existing stock, deliveries, customers, forklifts, production shifts, or sanitation windows had to be respected during installation.
Solución de Ingeniería
La solución fue high-bay selective racking with reinforced frames, anti-corrosion coating, dock-facing buffer lanes, one-way forklift loops, and staging labels tied to vessel schedules. Heights, depths, finishes, protection accessories, and label positions were selected according to the real flow of products and materials.
The layout separated high-frequency and low-frequency areas, clarified display, reserve, inspection, and dispatch positions, and reinforced zones exposed to impact, humidity, or heavy handling.
Instalación y Entrega
The project was staged between vessel peaks, with rack rows commissioned progressively so operations could keep receiving and dispatching containers. Components were sorted by zone and numbered so installation crews could move quickly from unloading to assembly.
Critical areas were completed first. After each phase, the team checked replenishment, picking, cleaning, customer circulation, or forklift routes before migrating the next zone.
Impacto Comercial
BohaiLink can absorb arrival peaks, separate import and export flows more clearly, and move pallets from dock to rack to dispatch with fewer conflict points. The result was not only more capacity, but better control of the whole operating environment.
Los indicadores clave fueron Pallet Positions +48%, Container Turnaround +27%, Cross-traffic Conflicts -34%. These figures show that storage capacity becomes valuable only when teams can use it quickly, safely, and consistently.
Valor a Largo Plazo
The warehouse now has a durable logistics backbone suited to Tianjin’s port environment and future growth in bonded and cross-border distribution. The client now has a clearer standard for future upgrades and site planning.
Para Runda Rack, este caso confirma que cada entorno requiere una lectura específica del sitio, no una especificación genérica.
¿Necesita una Solución Similar?
Expertos listos para diseñar un sistema a medida adaptado a sus objetivos específicos.