Gudang Pintar E-dagang Chengdu untuk CloudHorizon Fulfillment
Gambaran Projek
Projek ini di Chengdu untuk CloudHorizon Fulfillment memberi tumpuan kepada a regional fulfillment hub processing beauty products, snacks, household items, and campaign-driven e-commerce inventory. Matlamatnya bukan sekadar menambah rak, tetapi membina sistem yang menyokong kapasiti, keselamatan dan kelajuan operasi harian.
Runda Rack reviewed the movement of goods, staff routines, available space, load requirements, and the points where time was being lost. The final design focused on carton flow racks, selective pallet storage, pick-face zoning, replenishment lanes, and shuttle-ready structural planning.
Konteks Pelanggan & Pasaran
In China’s dense commercial and industrial environment, every square metre must work harder. CloudHorizon Fulfillment needed a rack system that could support change, reduce daily friction, and remain clear for staff, shoppers, inspectors, or forklift operators.
The project therefore required more than standard shelving. It needed a layout logic that could support seasonal changes, campaign peaks, replenishment, cleaning, audit control, and future expansion.
Cabaran
Cabaran utama ialah daily order profiles changed sharply during livestream events and shopping festivals, causing fast movers to run out at pick faces while slow movers occupied prime locations. This issue affected productivity, safety, inventory control, and the quality of presentation or storage.
The site also had to keep operating. Existing stock, deliveries, customers, forklifts, production shifts, or sanitation windows had to be respected during installation.
Penyelesaian Kejuruteraan
Penyelesaiannya ialah A/B/C velocity zones, carton-flow lanes for fast movers, reserve pallets behind replenishment paths, and rack lines compatible with future automation. Heights, depths, finishes, protection accessories, and label positions were selected according to the real flow of products and materials.
The layout separated high-frequency and low-frequency areas, clarified display, reserve, inspection, and dispatch positions, and reinforced zones exposed to impact, humidity, or heavy handling.
Pemasangan & Penyerahan
The implementation team tested slotting assumptions with order data before installation, then moved SKUs into the new layout by velocity group over one weekend. Components were sorted by zone and numbered so installation crews could move quickly from unloading to assembly.
Critical areas were completed first. After each phase, the team checked replenishment, picking, cleaning, customer circulation, or forklift routes before migrating the next zone.
Impak Perniagaan
Pickers walk less, replenishment teams refill active faces without blocking packing lanes, and managers can re-slot campaign products before demand spikes. The result was not only more capacity, but better control of the whole operating environment.
Metrik utama projek ini ialah Picking Speed +33%, Replenishment Interruptions -37%, Automation-ready Rack Lines. These figures show that storage capacity becomes valuable only when teams can use it quickly, safely, and consistently.
Nilai Jangka Panjang
CloudHorizon gained a layout that works today with manual picking and can evolve toward automated movement as order volume grows. The client now has a clearer standard for future upgrades and site planning.
Bagi Runda Rack, kes ini membuktikan bahawa setiap tapak memerlukan reka bentuk khusus, bukan spesifikasi umum.
Perlukan Penyelesaian Serupa?
Pakar kami sedia mereka bentuk sistem paparan atau rak tersuai mengikut matlamat spesifik anda.